Dealers

Dealer resources

Section details, CSI specifications, forms and close-out documents. Quotes back within 24 hours, 10–15 business day lead times on standard systems.

Proceed to IWS dealer resources

If IWS has already provided you with a password, enter it below to continue.

Don't have a password? Request access.

Open resources

No password needed for these.

Questions about your account?

Call 773-743-6025 Mon–Fri 8:00a–4:30p CST.

Dock receiving: Mon–Fri 8:00a–12:00p, 12:30p–4:00p CST

Document library

11 of 20 documents are published. 9 are still being prepared and are marked as such above.

Fig. 02Lead times

Current project lead times.

A.R.O. = after receipt of order. These are project lead times for the items listed. The standard lead time published on our purchasing page covers standard shade systems — confirm with your account representative which applies to your scope.

Current project lead times after receipt of order
ItemLead timeBasis
Electrical drawings2 weeksA.R.O.
Electrical parts pre-ship4 weeksA.R.O.
Custom pockets + bottom closures4 weeksA.R.O.
Shade systems — vertical8–9 weeksA.R.O.

Fig. 03On site

What is included on site.

So it is priced once, in the bid, rather than argued about on the building.

Site meetings
Airfare, transportation, lodging and expenses are included for four site meetings. Additional onsite meetings requested beyond those four are billed at actual expense.
Scissor lifts
Scissor lifts are to be provided onsite by the customer.
Electrical work
No electrical work is included in an IWS order; it is to be performed by others.

Full terms & conditions.

Fig. 04Electrical drawings

Electrical drawing services.

We produce the motor and control layout the electrical contractor builds from. Two weeks after receipt of order. The electrical work itself is by others.

  1. 01Define

    We take the shade schedule, the reflected ceiling plan and the control intent, and confirm what has to be powered, switched and integrated.

  2. 02Lay out

    We produce the motor and control layout — motor positions, home runs, power supply locations and controller placement — coordinated against the pocket and closure details.

  3. 03Issue

    Drawings are issued for the electrical contractor to build from, two weeks after receipt of order.

Electrical drawing services

  • PDF
    Example — power riser diagram
    A worked example of the riser diagram IWS produces. IWS to supply a redacted sample.
    Coming soonNeed it now?
  • PDF
    Example — shade + motor layout
    A worked example of a motor and control layout. IWS to supply a redacted sample.
    Coming soonNeed it now?

More on how control layers and integration work in the motorization guide.

Not an IWS dealer yet?

Tell us about your business and the work you take on. We'll get you set up with pricing, resources and credit terms if you're eligible.

Dealer Access | Illinois Window Shade Company